ICL Concentration Point B

Concentration Point B is situated in the electrical riser opposite Room F6 on the first floor. It covers the cabling for the Southern section of the first floor and second floor as well as a small section of the third floor.

Backbone downlinks run from this concentration point to CP-A (8 lines) and CP-C (8 lines).

Rooms Supported on First Floor

Lines from the following Locations terminate at this Concentration Point.

Rooms

Rooms Supported on Second Floor

Lines from the following Locations terminate at this Concentration Point.

Rooms

Rooms Supported on Third Floor

Lines from the following Locations terminate at this Concentration Point.

Rooms