Concentration Point D is situated in the corridor opposite Room G6 on the western side of the ground floor. It covers the cabling for the whole of the western side of the ground floor.
Backbone downlinks run from this concentration point to CP-A (currently using legacy co-ax cable which will be replaced with 8 lines of Cat 5 twisted pair) and CP-E (4 lines).
|
|
|
|
|
|
![]()