CCL Backbone Topological View

The backbone in CCL runs virtically between the four concentration points, one on each floor, in a riser behind the lift shaft.

(Click on the coloured numbers for details of downlinks
or on the 19" frames themselves to go to a specific floor).

Backbone Links from Basement to Ground Floor

Link I/D
Cable I/D
Length (m)
D/BG/1
B2/1
8.3
D/BG/2
B2/2
8.3
D/BG/3
B2/3
8.3
D/BG/4
B2/4
8.3

Backbone Links from Ground Floor to First Floor

Link I/D
Cable I/D
Length (m)
D/GF/1
G1/1
8.5
D/GF/2
G1/2
8.3
D/GF/3
G1/3
8.3
D/GF/4
G1/4
8.3

Backbone Links from First Floor to Second Floor

Link I/D
Cable I/D
Length (m)
D/FS/1
B1/1
8.5
D/FS/2
B1/2
8.5
D/FS/3
B1/3
8.5
D/FS/4
B1/4
8.5

Backbone Links from Basement to First Floor

Link I/D
Cable I/D
Length (m)
D/BF/1
Y1/1
11.6
D/BF/2
Y1/2
11.6
D/BF/3
Y1/3
11.4
D/BF/4
Y1/4
11.4
 

Backbone Links from Basement to Second Floor

Link I/D
Cable I/D
Length (m)
D/BS/1
G2/1
14.5
D/BS/2
G2/2
14.5
D/BS/3
G2/3
14.5
D/BS/4
G2/4
14.5